PRJ-CIR-002 // 2026OPERATIONALRecycling

Silesia Circular PV & Composite Blade Recovery Hub

Automated thermal-mechanical delamination and composite upcycling plant recovering high-purity silicon, silver, solar glass, and structural GFRP fibers.

Built on a revitalized former coal-mining industrial zone in Upper Silesia, this flagship EnerX Circular Hub processes 30,000 tons of end-of-life solar modules and decommissioned wind turbine blades annually. Powered by its own 4.5 MWp rooftop solar + BESS microgrid, the facility achieves 96.8% mass recovery on PV panels and transforms GFRP wind blades into structural composite boards and Eco Park decking.

SITE LOCATION & COORDINATES
Katowice, Poland
50.2649° N, 19.0238° E
CLIENT & INDUSTRIAL SECTOR
Central European Renewable Repowering Alliance
Circular PV & Wind Blade Recycling
SOLAR PV CAPACITY
18,000 t/yr PV Modules Processed
30,000 t/yr
BESS STORAGE / THROUGHPUT
12,000 t/yr Wind Blades Upcycled
96.8% Recovery
TRANSFORMATION AUDIT // BEFORE VS. AFTER ENERX

Before & After EnerX Deployment

Audited operational and financial comparison before and after engineering integration.

Before EnerX (Legacy)BASELINE AUDIT

Conventional hammer-mill crushing degraded solar glass into low-value landfill aggregate and sent wind blades to cement kilns.

After EnerX (Active)ENERX VERIFIED

EnerX thermal-knife delamination and GFRP upcycling recover 96.8% pure fractions and high-margin structural boards.

KPI / Parameter 01
Solar Panel Mass Recovery Purity
Before EnerX
62% (Mixed Cullet)
After EnerX
96.8% (Optical Grade)
+34.8% Recovery
KPI / Parameter 02
Wind Blade Landfill / Co-Incineration
Before EnerX
100% Burned/Buried
After EnerX
0% (93.5% Upcycled)
Zero Landfill
KPI / Parameter 03
Secondary Commodity Revenue per Ton
Before EnerX
€140 / ton
After EnerX
€690 / ton
4.9× Higher Value
SYSTEM ARCHITECTURE SCHEMATIC

System Architecture & Engineering Topology

Integrated multi-node busbar connecting generation, storage, control, and circular recovery.

EPC & ENGINEERING DELIVERY

Turnkey EPC & Engineering Scope of Work

  • 1Engineering and commissioning of two parallel 65-panel/hour automated PV delamination lines
  • 2Deployment of mobile wet diamond-wire field cutting crews across Polish and German wind farms
  • 3Installation of closed-loop electrostatic, eddy-current, and optical sorting cascades
  • 4Setup of the thermo-mechanical composite pressing line producing 450,000 m²/year of circular boards
IEC 61850 / SCADA CERTIFIED100% TURNKEY
PROJECT ID: PRJ-CIR-002 • COORDS: 50.2649° N, 19.0238° E
INTERACTIVE VISUAL INSPECTION

Site Documentation: Field Photos vs. 3D BIM / CAD Visualization

CAM-01 // PV DELAMINATION HALL
GLASS RECOVERY: 98.5% • AL: 99.2%

Automated Frame Stripping & Glass Cullet Optical Sorter

Separates low-iron solar glass with <0.015% Fe2O3 purity ready for float-glass furnaces.

OPTICAL + IR VERIFIED50.2649° N, 19.0238° E
CAM-02 // COMPOSITE PRESS LINE
FLEXURAL STRENGTH: 58 MPa • 0% LANDFILL

Upcycled Wind-Blade Composite Board Extrusion

High-density boards shipped directly to EnerX Eco Parks for zero-rot walkways.

OPTICAL + IR VERIFIED50.2649° N, 19.0238° E
CAM-03 // SILICON & SILVER REFINING
SILICON: 96.4% • ZERO ACID EFFLUENT

Electrostatic Cu/Ag/Si Cell Powder Separator

Recovers metallurgical-grade silicon and silver paste without toxic hydrofluoric acid.

OPTICAL + IR VERIFIED50.2649° N, 19.0238° E
AUDITED PERFORMANCE METRICS

Verified Results & Measurable Impact

Audited operational KPIs recorded after commissioning.

28,950 t

Secondary Raw Materials Returned to Industry/Yr

Diverts 96.5% of incoming solar and wind waste from European landfills.

-81% CO₂

Carbon Footprint Reduction vs. Virgin Materials

Independently verified under ISO 14040 Life Cycle Assessment (LCA) standards.

450k m²/yr

Structural Composite Boards & Eco Decking Produced

Directly supplies European construction partners and EnerX Eco Park developments.

VERIFIED CLIENT EXECUTIVE STATEMENT
“With the Katowice plant, EnerX solved the hardest challenge of Europe's wind and solar repowering wave—turning decommissioned blades and panels into profitable industrial commodities.”
Tomasz Zieliński•Chairman of the Board, Central European Renewable Repowering Alliance

Planning a similar energy, Eco Park, or circular recycling project?

Request a customized feasibility study, 3D OpenSolar layout, and financial ROI model from the EnerX engineering team.