PRJ-POL-009 // 2025OPERATIONALEnergyBESSBackupO&M

Mazovia Industrial Microgrid & Backup Reserve

Sub-8ms uninterruptible islanding transfer and frequency containment reserve protecting continuous 24/7 manufacturing lines.

A single 100-millisecond voltage sag previously cost this continuous polymer extrusion facility over €380,000 in scrapped material and reactor restarts. EnerX engineered a 42 MW / 126 MWh grid-forming BESS with solid-state static transfer switches (STS) and 18.5 MWp of industrial rooftop PV—achieving seamless 7.4 ms islanding and shaving peak demand charges by 41%.

SITE LOCATION & COORDINATES
Płock, Poland
52.5463° N, 19.7065° E
CLIENT & INDUSTRIAL SECTOR
Central European Precision Chemical & Polymer Works
Heavy Industry BESS & Critical Backup
SOLAR PV CAPACITY
18.5 MWp Rooftop & Carport PV
42.0 MW
BESS STORAGE / THROUGHPUT
42.0 MW / 126.0 MWh Industrial UPS BESS
126 MWh LFP
TRANSFORMATION AUDIT // BEFORE VS. AFTER ENERX

Before & After EnerX Deployment

Audited operational and financial comparison before and after engineering integration.

Before EnerX (Legacy)BASELINE AUDIT

Legacy diesel generators required 18 seconds to start—far too slow to prevent PLC resets and polymer line scrap during grid sags.

After EnerX (Active)ENERX VERIFIED

Solid-state STS + 126 MWh Grid-Forming BESS isolates grid faults in 7.4 ms with zero voltage drop on critical lines.

KPI / Parameter 01
Backup Transfer Time
Before EnerX
18,000 ms (Diesel)
After EnerX
7.4 ms (STS + BESS)
2,400× Faster
KPI / Parameter 02
Annual Outage Scrap Losses
Before EnerX
€1.15M / year
After EnerX
€0 (Zero Trips)
-100% Scrap
KPI / Parameter 03
Contracted Peak Grid Power
Before EnerX
38.4 MW Peak
After EnerX
22.6 MW Capped
-41.1% Peak
SYSTEM ARCHITECTURE SCHEMATIC

System Architecture & Engineering Topology

Integrated multi-node busbar connecting generation, storage, control, and circular recovery.

EPC & ENGINEERING DELIVERY

Turnkey EPC & Engineering Scope of Work

  • 1Design and integration of 15 kV solid-state static transfer switches (STS) for zero-downtime islanding
  • 2Turnkey installation of 42 MW / 126 MWh liquid-cooled LFP BESS with active harmonic filtering
  • 3Deployment of 18.5 MWp lightweight East-West rooftop PV across 11 factory halls
  • 4Commissioning of Peak Shaving & Capacity Market (Rynek Mocy) automated dispatch
IEC 61850 / SCADA CERTIFIED100% TURNKEY
PROJECT ID: PRJ-POL-009 • COORDS: 52.5463° N, 19.7065° E
INTERACTIVE VISUAL INSPECTION

Site Documentation: Field Photos vs. 3D BIM / CAD Visualization

CAM-01 // STS SWITCHGEAR HALL
TRANSFER: 7.4 ms • ZERO FLICKER

15 kV Solid-State Static Transfer Switch Lineup

Isolates external utility grid faults in under 7.4 milliseconds—faster than a single 50 Hz half-cycle.

OPTICAL + IR VERIFIED52.5463° N, 19.7065° E
CAM-02 // BESS & PCS COMPOUND
AVAILABILITY: 99.999% • SLA TIER-4

42 MW Grid-Forming PCS & LFP Battery Enclosures

Provides instant synthetic inertia and voltage waveform support for sensitive CNC & extrusion drives.

OPTICAL + IR VERIFIED52.5463° N, 19.7065° E
CAM-03 // FACTORY ROOFTOP PV
100% SELF-CONSUMPTION • ZERO EXPORT

18.5 MWp East-West Aerodynamic Factory Array

Generates flat daytime baseload power consumed 100% behind the meter by polymer reactors.

OPTICAL + IR VERIFIED52.5463° N, 19.7065° E
AUDITED PERFORMANCE METRICS

Verified Results & Measurable Impact

Audited operational KPIs recorded after commissioning.

0 Outages

Zero Production Interruptions Since Commissioning

Successfully rode through 11 external grid voltage sags and 2 regional storm blackouts in Year 1.

-41% Peak

Reduction in Peak Demand Grid Charges

Automated BESS discharge caps factory grid draw during morning and evening industrial tariff peaks.

€2.4M / yr

Combined Energy Savings & Avoided Downtime

Full system CAPEX payback achieved in 3.8 years through self-consumption, peak shaving, and backup.

VERIFIED CLIENT EXECUTIVE STATEMENT
“Since EnerX commissioned the 7.4 ms static transfer switch and 126 MWh battery bank, our extrusion lines have not lost a single kilogram of polymer to external grid disturbances.”
Marek Kowalczyk, PhD•VP of Operations & Chief Engineer, Zakłady Chemiczno-Polimerowe Mazowsze S.A.

Planning a similar energy, Eco Park, or circular recycling project?

Request a customized feasibility study, 3D OpenSolar layout, and financial ROI model from the EnerX engineering team.

ENERX — Energy • Storage • Backup • Eco Park • Recycling