Skip to main content
Back to Projects Catalog
PRJ-ESP-014 // 2025OPERATIONALEnergyPVBESSO&M

Aragón Hybrid Solar + Grid-Forming BESS Hub

Co-located utility-scale N-Type bifacial solar plant coupled with liquid-cooled LFP storage and AI-driven EMS spot-market dispatch.

Engineered to eliminate midday solar curtailment and capture evening OMIE spot-market price peaks, the Aragón Hybrid Hub integrates 85 MWp of single-axis tracking N-Type bifacial PV with a 170 MWh containerized LiFePO4 battery bank. Managed 24/7 by EnerX EMS and our drone O&M team, it delivers dispatchable baseload green power to 14 industrial manufacturing facilities.

SITE LOCATION & COORDINATES
Zaragoza, Spain
41.6488° N, 0.8891° W
CLIENT & INDUSTRIAL SECTOR
Iberia Industrial Logistics & Grid Consortium
Utility Hybrid PV + Grid Storage
SOLAR PV CAPACITY
85.0 MWp N-Type Bifacial
85.0 MWp PV
BESS STORAGE / THROUGHPUT
170.0 MWh Liquid-Cooled LFP
170 MWh BESS
TRANSFORMATION AUDIT // BEFORE VS. AFTER ENERX

Before & After EnerX Deployment

Audited operational and financial comparison before and after engineering integration.

Before EnerX (Legacy)BASELINE AUDIT

Standalone solar assets suffered 29% midday curtailment and near-zero OMIE capture prices between 12:00 and 16:00.

After EnerX (Active)ENERX VERIFIED

170 MWh LFP BESS stores midday surplus and dispatches 64 GWh/yr into high-value evening peak windows.

KPI / Parameter 01
Midday Solar Curtailment Loss
Before EnerX
28.8% curtailed
After EnerX
0.4% (Stored in BESS)
-98.6% Loss
KPI / Parameter 02
Average Captured Electricity Price
Before EnerX
€41.50 / MWh
After EnerX
€94.80 / MWh
+128.4% Value
KPI / Parameter 03
Evening Peak Baseload Dispatch
Before EnerX
0 MWh after 19:30
After EnerX
170 MWh / day
4h Firm Power
SYSTEM ARCHITECTURE SCHEMATIC

System Architecture & Engineering Topology

Integrated multi-node busbar connecting generation, storage, control, and circular recovery.

EPC & ENGINEERING DELIVERY

Turnkey EPC & Engineering Scope of Work

  • 1Full turnkey EPC engineering, procurement, and high-voltage 132 kV grid interconnection
  • 2Installation of 85 MWp 1P single-axis solar trackers with smart wind-stow algorithms
  • 3Integration of 170 MWh liquid-cooled LFP BESS with aerosol & clean-agent fire suppression
  • 4Deployment of EnerX AI EMS for automated OMIE day-ahead & intraday energy arbitrage
  • 5Long-term 15-year O&M contract with automated IR drone thermography and robotic dry-cleaning
IEC 61850 / SCADA CERTIFIED100% TURNKEY
PROJECT ID: PRJ-ESP-014 • COORDS: 41.6488° N, 0.8891° W
INTERACTIVE VISUAL INSPECTION

Site Documentation: Field Photos vs. 3D BIM / CAD Visualization

CAM-01 // NORTH TRACKER SECTOR
BIFACIAL GAIN: +14.2% • PR: 88.6%

Bifacial N-Type Tracker Array at Dawn

High-albedo crushed limestone ground cover boosts rear-side bifacial gain by +14.2%.

OPTICAL + IR VERIFIED41.6488° N, 0.8891° W
CAM-02 // BESS CORRIDOR
ROUND-TRIP EFFICIENCY: 93.4% • ΔT < 2.1°C

170 MWh Liquid-Cooled LFP Battery Yard

34 outdoor IP65 battery containers maintaining ΔT < 2.1°C across all cell racks during 41°C summer peaks.

OPTICAL + IR VERIFIED41.6488° N, 0.8891° W
CAM-03 // HV SUBSTATION
GRID SYNC: 50.00 Hz • THD < 1.4%

132 kV Step-Up Substation & SCADA Control Room

Dual 60 MVA power transformers with sub-second reactive power compensation.

OPTICAL + IR VERIFIED41.6488° N, 0.8891° W
AUDITED PERFORMANCE METRICS

Verified Results & Measurable Impact

Audited operational KPIs recorded after commissioning.

168.4 GWh

Clean Electricity Dispatched Annually

38% of total solar generation is shifted via BESS to high-tariff evening hours (19:00–23:00).

+34.2% ROI

Revenue Uplift via AI Spot Arbitrage

Outperforms standalone solar-only plants by avoiding zero-price midday cannibalization.

64,200 t

Annual CO₂ Emissions Eliminated

Certified guarantees of origin (GoO) supplied to regional industrial off-takers.

VERIFIED CLIENT EXECUTIVE STATEMENT
“Co-locating 170 MWh of liquid-cooled storage with EnerX AI EMS transformed our Zaragoza solar park from an intermittent generator into a dispatchable 24/7 industrial power plant.”
Carlos Mendoza-Vidal•Chief Infrastructure Officer, Iberia Industrial Logistics & Grid Consortium

Planning a similar energy, Eco Park, or circular recycling project?

Request a customized feasibility study, 3D OpenSolar layout, and financial ROI model from the EnerX engineering team.

ENERX — Energy • Storage • Backup • Eco Park • Recycling